CDW RECYCLING PLANTS: FINANCIAL ANALYSIS, INFLUENCE FACTORS AND THE ROLE OF MAIN PLAYERS
DOI:
https://doi.org/10.29183/2447-3073.MIX2021.v7.n2.79-92Keywords:
Construction and Demolition Waste (CDW), CDW Recycling Plant, Recycled Aggregate.Abstract
Although some countries have presented positive results from strategies to reduce construction and demolition (CDW) waste generation and/or increase recycling, many have high generation rates and low recycling rates, like Brazil. This paper presents results of two case studies, involving CDW recycling plants: a) with external sale of recycled aggregate (RA); and b) without external sale of RA, with the objective to analyze financial results, the main influence factors and the role of different players in the viability of CDW recycling. Results show the essential role that must be played by the Public Power in terms of waste flow guarantee: the arrival of the waste in the recycling plants and the consumer market for the recycled product. However, while landfill disposal and natural aggregate are available at a relatively low cost,the flow guarantee is a challenge. Both cases showed a positive financial result, considering the first years of operation. In the first, results showed advantages in the 75t/h plant compared to the 50t/h plant. In the second, the amount of the recycled aggregate consumed is a key factor in order to optimize the costs related to the implementation and operation of the construction waste recycle plant.References
ABRECON - Associação Brasileira para Reciclagem de Resíduos da Construção (2015) Pesquisa Setorial da Reciclagem de Resíduos da Construção 2014/2015. Relatório 2.
Agopyan V and John VM (2011) O Desafio da Sustentabilidade na Construção Civil. In: Goldenberg, J. (Ed.), Série Sustentabilidade, vol. 5. Blucher: São Paulo.
Ajayi SO, Oyedele LO, Bilal M, Akinade OO, Alaka HA, Owolabi AH and Kadiri KO (2014) Waste effectiveness of the construction industry: Understanding the impediments and requisites for improvement. Resources, Conservation & Recycling 102: 101-112.
Al-Hajj A and Hamani K (2011) Material waste in the UAE Construction Industry: Main causes and minimization practices. Architectural Engineering and Design Management 7 (4): 221-235.
Bahera M, Bhattacharyya SK, Minocha AK and Maiti S (2014) Recycled aggregate from C&D waste & its use in concrete–A breakthrough towards sustainability in construction sector: A review. Construction and Building Materials 68: 501-516.
Bakshan A, Srour I, Chehab G and El-Fadel M (2015) A field based methodology for estimating waste generation rates at various stages of construction projects. Resources, Conservation and Recycling 100: 70-80.
Brasil. Lei Federal 12.305/2010 (2010) Institui a Política Nacional de Resíduos Sólidos; Diário Oficial da União: Brasília, 2 de agosto.
Brasil. Lei Federal 10.522/2012 (2012) Institui o sistema de gestão sustentável de resíduos da construção civil e resíduos volumosos e o plano municipal de gerenciamento integrado de resíduos da construção civil e resíduos volumosos. Diário Oficial da União: Belo Horizonte, 24 ago.
Brasil. Resolução Conama nº 307 (2002) Estabelece diretrizes, critérios e procedimentos para a gestão dos resíduos da construção civil. Diário Oficial da União: Brasília, 05 jul.
Cachim P, Velosa AL and Ferraz E (2014) Substitution materials sustainable concrete production Portugal. Journal of Civil Engineering 18(1): 60 -66.
Conseil International du Bâtiment, CIB (2011) Agenda XXI on Sustainable Construction.
Coelho A and Brito J (2011) Generation of construction and demolition waste in Portugal. Waste Management & Research 29(7): 739-750.
Coelho A and Brito J (2012) Environmental analysis of a construction and demolition waste recycling plant in Portugal–Part II: environmental sensitivity analysis. Waste Management 33(1): 147-161.
Coelho A and Brito J (2013a) Environmental analysis of a construction and demolition waste recycling plant in Portugal–Part I: energy consumption and CO2 emissions. Waste management 33(5): 1258-1267.
Coelho A and Brito J (2013b) Economic viability analysis of a construction and demolition waste recycling plant in Portugal–part I: location, materials, technology and economic analysis. Journal of Cleaner Production 39: 338-352.
Consil of the European Union. Waste management and recycling: Concil adopts new rules (2018). Disponível em: https://www.consilium.europa.eu/pt/press/press-releases/2018/05/22/waste-management-and-recycling-council-adopts-new-rules/ (accesso em 10 de maio 2019).
Directive 2008/98/EC (2008). Waste Framework directive. Brussels, Belgium.
Huang WL, Lin DH, Chang NB and Lin KS (2002) Recycling of construction and demolition waste via a mechanical sorting process. Resources, Conservation and Recycling 37(1): 23-37.
Katz A and Baum H (2010). A novel methodology to estimate the evolution of construction waste in construction site. Waste Management 31(2): 353-358.
Kern A P, Dias MF, Kulakowski MP and Gomes LP (2015).Waste generated in high-rise buildings construction: A quantification model based on statistical multiple regression. Waste Management 39:35-44.
Kern AP, Amor LV, Angulo SC and Montelongo AF (2018) Factors influencing temporary wood waste generation in high-rise buildings construction. Waste Management 78: 446-455.
Ledesma EF, Jiménez JR, Ayuso J, Fernández JM and Brito J (2015). Maximum feasible use of recycled sand from construction and demolition waste for eco-mortar production–Part-I: ceramic masonry waste. Journal of Cleaner Production 87: 692-706.
Martin J and Henrichs T (2015) The European environment state and outlook 2015 Chapter 4: natural resources and waste. Disponível em: https://www.eea.europa.eu/downloads/8d6424f22d6d0fabbac2d0177d9ce923/1464921025/chapter4.xhtml.pdf (accesso em 12 de dezembro de 2019).
Mália MAB, Brito J, Pinheiro MD and Bravo M (2013) Construction and demolition waste indicators. Waste Management &Research 31(3): 241-255.
Manowong E (2012) Investigating factors influencing construction waste management efforts in developing countries: an experience from Thailand. Waste Management 30(1): 56-71.
Melo AB, Gonçalves AF and Martins IM (2011) Construction and demolition waste generation and management in Lisbon (Portugal). Resources, Conservation and Recycling 55(12): 1252-1264.
Miranda LFR, Angulo SC and Carelli ED (2009) A reciclagem de resíduos de construção e demolição no Brasil: 1986-2008. Ambiente Construído 9 (1): 57-71.
Miranda LFR (2015) Inovações tecnológicas para a triagem de RCD. In: Seminário Nacional de Reciclagem de Resíduos da Construção Civil e Demolição. São Paulo, ABRECON.
Moyano PM and Agudo AR (2013) Selective classification and quantification model of C&D waste from material resources consumed in residential building construction. Waste Management & Research 31: 458-474.
Nunes KRA, Mahlerb CF, Vallea R. and Neves C (2007) Evaluation of investments in recycling centers for construction and demolition wastes in Brazilian municipalities. Waste Management 27(11): 1531-1540.
Ortiz O, Pasqualino JC and Castells F (2010) Environmental performance of construction waste: comparing three scenarios from a case study in Catalonia, Spain. Waste Management 30(4): 646-654.
Pinto TP (1999) Metodologia para a gestão diferenciada de resíduos sólidos da construçãourbana. Tese (Doutorado)- Escola Politécnica da Universidade de São Paulo,São Paulo.
Ram V and Kalidindi SN (2017) Estimation of construction and demolition waste using waste generation rates in Chennai, India. Waste Management & Research, 35(6): 610–617.
Sabai MM, Cox MGDM, Mato RR, Egmond ELC and Lichtenberg JJN (2013) Concrete block production from construction and demolition waste in Tanzania. Resources Conservation and Recycling 72: 9-19.
Sáez PV, Merino MDR, Porras-Amores C and González ASA (2014). Assessing the accumulation of construction waste generation during residential building construction works. Resources, Conservation and Recycling 93: 67-74.
Seadon JK (2010) Sustainable waste management systems. Journal of Cleaner Production 18(16): 1639-1651.
Shima H, Tateyashiki H, Matsuhashi R and Yoshida Y (2005) An advanced concrete recycling technology and its applicability assessment through input-output analysis. Journal of Advanced Concrete Technology 3(1): 53-68.
Syymonds Group Ltd (1999) Construction and Demolition Waste Management Practices and Their Economic Impacts. Report to DGXI, European Commission, Final Report. Disponível em: https://ec.europa.eu/environment/waste/studies/cdw_report.htm (accesso em 23 de outubro de 2019).
Tam VWY and Tam CM (2006) Evaluations of existing waste recycling methods: a Hong Kong study. Building and Environment 41(12): 1649-1660.
Tomasawa F, Noguchi T and Tamura M (2005) The way concrete recycling should be. Journal of Advanced Technology 3(1): 3-16.
Ulsen C (2011) Caracterização e separabilidade de agregados miúdos produzidos a partir de resíduos de construção e demolição. Tese (Doutorado) – Escola Politécnica, Universidade de São Paulo.
Downloads
Published
How to Cite
Issue
Section
License
Creative Commons Copyright Notice
Attribution 4.0 International