Analysis of the relation between the principles of movement and storage and lean principles: three cases in construction companies
Keywords:
logistic, lean construction, site management, productivity, building constructionAbstract
The construction industry productivity has been severely affected by the lack of actions that promote the improvement of activities related to the processes of movement and storage. Researches in this area become necessary, as improvements of such sub activities converge to the optimization of the process. The use of lean philosophy in construction sites has proven to be efficient in achieving this goal. This study aimed to evaluate the relationship between lean practice maturity in three construction companies in the city of Fortaleza, Ceará, and their compliance with several principles regarding movement and storage. For that, a checklist was applied considering aspects such as transportation and material allocation, movement and well-being of the workers. It was verified that the results point to the existence of a proportionality between the lean practice and the fulfillment of these principles. The listing of relevant practices also allowed to better identifying the potential for improvement by managers and employees. In addition, the compliance with these principles is capable of significantly impact the productivity of the company without necessarily representing large increases in the costs of the enterprise.References
Alpenberg, J., & Scarbrough, D. P. (2016). Exploring communication practices in lean production. Journal of Business Research, 69 (11), 4959–4963.
Alves, T. C. L. (2000). Diretrizes para a gestão dos fluxos físicos em canteiros de obras: proposta baseada em estudos de caso. Dissertação (Mestrado em Engenharia Civil) – Curso de Pós-Graduação em Engenharia Civil. Universidade Federal do Rio Grande do Sul, Porto Alegre.
Bajjou, M. S., Chafi, A., Ennadi, A., & El Hammoumi, M. (2017). The practical relationships between lean construction tools and sustainable development: A literature review. Journal of Engineering Science and Technology Review, 10(4): 170–177. https://doi.org/10.25103/jestr.104.20
Ballard, G., & Howell, G. (1998). Shielding production: an essential step in production control. Journal of Construction Engineering and Management, 124(1): 11–17.
Bogado, J. G. M. (1998). Aumento da Produtividade e Diminuição de Desperdícios na Construção Civil: um Estudo de Caso - Paraguai. Dissertação (Mestrado em Engenharia Civil) - Universidade Federal de Santa Catarina, Florianópolis.
CBIC. (2017). PIB Brasil e Construção Civil. Disponível Em: <http://www.cbicdados.com.br/menu/pib-E-Investimento/pib-Brasil-E-Construcao-Civil>. Acesso Em: 26 Set. 2017.
Fellows, R. & Liu, Anita. (2015) Research Methods for Construction. 4 ed. West Sussex: John Wiley & Sons.
Formoso, C. T., De Cesare, C. M., Lantelme, E. M., & Soibelman, L. (1996). As perdas na construção civil: conceitos, classificações e seu papel na melhoria do setor. Núcleo Orientado para a Inovação da Edificação, Programa de Pós-Graduação em Engenharia Civil, Universidade Federal do Rio Grande do Sul.
Jato-Espino, D., Castillo-Lopez, E., Rodriguez-Hernandez, J. & Canteras-Jordana, J. C. (2014) A review of application of multi-criteria decision making methods. Automation in Construction, 45, 151-162. https://doi.org/10.1016/j.autcon.2014.05.013.
Koskela, L. (2000). An exploration towards a production theory and its application to construction. Espoo. Technical Research Centre of Finland, VTT Publications 408.
Marconi, M. A.; Lakatos, E. M. (2004) Metodologia científica. São Paulo: Atlas.
Melton, T. (2005). The benefits of lean manufacturing: what lean thinking has to offer the process industries. Chemical Engineering Research and Design, 83(6): 662–673.
Mota, G. R. (2009). Princípios de movimentação e armazenagem na construção civil. Monografia (Graduação em Engenharia Civil), Universidade Federal do Ceará, Fortaleza.
Mota, G. R., Santos, M. V. A., Vieira, M. M., Heineck, L. F., & Oliveira, B. B. (2012). Princípios de movimentação e armazenagem na construção civil. In XIV Encontro Nacional de Tecnologia no Ambiente Construído. Juiz de Fora.
Nogueira, M. A. A. (2010). Implementação da gestão da produção Lean: estudo de caso. Dissertação (Mestrado em Engenharia e Gestão Industrial) - Faculdade de Ciências e Tecnologia - Universidade Nova de Lisboa, Lisboa.
Pfaffenzeller, M. S., Silva, G. G. M. P., Barros, A. L., Shinji, G., & Salles, M. P. (2015). Lean Thinking na Construção Civil: Estudo da Utilização de ferramentas da filosofia Lean em diferentes fluxos da construção civil. Revista Iberoamericana de Engenharia Industrial, 7(14), 86–107. Retrieved from http://stat.necat.incubadora.ufsc.br/index.php/IJIE/article/view/3765/pdf_106
Picchi, F. A. (2003). Oportunidades da aplicação do Lean Thinking na construção. Ambiente Construído. Porto Alegre - RS.
Pinto, J. P. (2008). Lean thinking. Comunidade Lean Thinking, 1–8.
Potts, K. (2008). Construction cost management: learning from case studies. London: Taylor & Francis.
Said, H., & El-Rayes, K. (2010). Optimizing material procurement and storage on construction sites. Journal of Construction Engineering and Management, 137(6): 421–431.
Sales, A. L., Barros Neto, J. P., & Almino, I. (2004). A gestão dos fluxos físicos nos canteiros de obras focando a melhoria nos processos construtivos. In Conferência latino-americana de construção sustentável.
Sampieri, R. H., Collado, C. F. & Lucio, M. P. B. (2013). Metodologia científica. 5 ed. Porto Alegre: AMGH.
Santos, A. (1995). Método alternativo de intervenção em obras de edificações enfocando o sistema de movimentação e armazenamento de materiais: um estudo de caso. Dissertação (Mestrado em Engenharia Civil) – Curso de Pós-Graduação em Engenharia Civil, Universidade Federal do Rio Grande do Sul, Porto Alegre.
Saurin, T. A. (1997). Método para diagnóstico e diretrizes para planejamento de canteiros de obra de edificações. Dissertação (Mestrado em Engenharia Civil) – Curso de Pós-Graduação em Engenharia Civil, Universidade Federal do Rio Grande do Sul, Porto Alegre.
Saurin, T. A., & Formoso, C. T. (2006). Planejamento de canteiros de obra e gestão de processos. In Recomendações Técnicas Habitare (Vol. 3). Porto Alegre.
Silva, F. B. (2000). Conceitos e Diretrizes para Gestão da Logística no Processo de Produção de Edifícios. Dissertação (Mestrado em Engenharia Civil) – Escola de Engenharia – Universidade Federal do Rio Grande do Sul, Porto Alegre.
Spear, S., & Bowen, H. K. (1999). Decoding the DNA of the Toyota production system. Harvard Business Review, 77: 96–108.
Tezel, A., & Nielsen, Y. (2013). Lean Construction Conformance among Construction Contractors in Turkey. Journal of Management in Engineering, 29(3): 236–250. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000145
Vieira, H. F. (2006). Logística Aplicada à Construção Civil: como melhorar o fluxo de produção na obra. São Paulo: Pini.
Downloads
Published
Issue
Section
License
The Journal reserves the right to make normative, spelling and grammatical changes in the published article, aiming at maintaining the proper standard of the language, while respecting the personal style of the authors.
Author (s) are fully responsible for the published article. Journal of Lean Systems is not responsible for any violations of Copyright.
Journal of Lean Systems allows the author to retain the copyright of articles accepted for publication without restriction.
Plagiarism constitutes unethical behavior and is inconceivable. This journal reserves the right to use any methods of detecting plagiarism to analyze the submitted works.
This journal is licensed under a Creative Commons License.