Application of the poka yoke device for quality improvement in work safety: a case study

Authors

  • Alyson Pereira Rodrigues Universidade CEUMA
  • Ricardo Daher Universidade CEUMA

Keywords:

Poka Yoke, Improvement, Human Errors, Safety at Work

Abstract

The aim of this research is to apply the Poka-Yoke system in an industrial environment aiming at improving the quality of work safety and guaranteeing the performance of activities with reduction of human errors. This work is characterized as a qualitative and exploratory research, which uses as technical procedures the bibliographic research and a case study in a northeastern industry. This research presents first the principles of Poka-Yoke and its application and the main steps of its implementation. Next, the presentation of the company is described as well as the methodology used to achieve the results and discussions. Finally, the final considerations and recommendations for future work are presented.

Author Biographies

Alyson Pereira Rodrigues, Universidade CEUMA

Atua no Departamento de Engenharia de Produção como professor no grupo de escrita de livros e colaboradores da liga acadêmica de Simulação.

Ricardo Daher, Universidade CEUMA

Departamento de Engenharia de Produção

References

Aull F. Modell zur Ableitung effizienter Implementier ungs strategien für Lean-Production-Methoden. Diss. TU München (2012). München: Herbert Utz.

Barash, Moshe M.(1990) Poka-yoke: Improving product quality by preventing defects. Journal Of Manufacturing Systems, v. 9, n. 2, p.178-179. Elsevier BV. http://dx.doi.org/10.1016/0278-6125(90)90033-e.

Barbosa,M.R., et al.(2016) A metodologia enxuta e sua contribuição em uma instituição hospitalar. Journal of Lean Systems, Florianópolis,SC, v. 1, n. 3, p. 53-68.

Berger, Dietrich et al (2017). Effects of defects in series production of hybrid CFRP lightweight components – detection and evaluation of quality critical characteristics. Measurement,v.95,p.389-394.ElsevierBV. http://dx.doi.org/10.1016/j.measurement.2016.10.003.

Calarge, F.A., Davanso, J. C.(2003;0 Conceito de dispositivos à prova de erros utilizados na meta do zero defeito em processos de manufatura. Revista de Ciência & Tecnologia, vol. 11, nº 21 - pp. 7-18 - UNIMEP. Piracicaba.

Carelli,L.P.F, et al.(2016) Proposta de adequação do processo de inspeção com base nos conceitos do lean manufacturing: estudo de caso em um fabricante de equipamentos agrícolas. Journal of Lean Systems, Florianópolis,SC, v. 1, n. 4, p. 66-86.

Carlage, F. A; Davanso, J. C. A (2001). Utilização de Dispositivos à Prova de Erros: Poka-Yoke Empregado na Melhoria de Desempenho de Processos de Manufatura. Conferência Brasileira de Engenharia de Manutenção.

Chase, R.B. Stewart, D.M (2002).Mistake Proofing: designing Errors Out. Morrisville: John Grout, v.11, n.2,p. 12-25.

Chen J, Black J.(1996). A fuzzy logic based approach for poka yoke stoplight control in unmanned manufacturing cells. Journal of Manufacturing Systems, v. 15:33–42.

Corrêa, H. L.; Corrêa, C. A. (2011). Administração de produção e operações: manufatura e serviços: uma abordagem estratégica. 2 ed. São Paulo: Atlas.

Eger, Florian et al.(2018). Zero Defect Manufacturing Strategies for Reduction of Scrap and Inspection Effort in Multi-stage Production Systems. Procedia Cirp,v. 67, p.368-373. Elsevier BV. http://dx.doi.org/10.1016/j.procir.2017.12.228.

Farris A, Van Aken E, Doolen T, Worley J. (2009). Critical success factors for human resource outcomes in kaizen events: an empirical study. International Journal of Production Economics, 117(1):42–65.

Ghinato, P. (2002) Lições Práticas para a Implementação da Produção Enxuta. EDUCS - Editora da Universidade de Caxias do Sul: Caxias do Sul.

Gil, Antônio Carlos (2010). Como elaborar projetos de pesquisa. 5° ed. – São Paulo: Atlas.

Gregorio, Francesco di; Maier, Martin E.; Steinhauser, Marco.(2018). Errors can elicit an error positivity in the absence of an error negativity: Evidence for independent systems of human error monitoring. Neuroimage, v. 172, p.427-436. Elsevier BV. http://dx.doi.org/10.1016/j.neuroimage.2018.01.081.

Gurumurthy A, Kodali R.(2009). Application of benchmarking for assessing the lean manufacturing implementation. Benchmarking: An International Journal v.16(2):274–308.

Hoellthaler, Georg; Braunreuther, Stefan; Reinhart, Gunther.(2018). Digital Lean ProductionAn Approach to Identify Potentials for the Migration to a Digitalized Production System in SMEs from a Lean Perspective. Procedia Cirp, v. 67, p.522-527. Elsevier BV. http://dx.doi.org/10.1016/j.procir.2017.12.255.

Hollnagel E. (2004). Barrier analysis and accident prevention. Ashgate.

Hopp W, Spearman M.(2004). To Pull or Not to Pull: What Is the Question? Manufacturing & Service Operations Management 2004,133-148.

Hung, Mao-hsiung; Hsieh, Chaur-heh (2015). A novel algorithm for defect inspection of touch panels. Image And Vision Computing, v. 41, p.11-25, Elsevier BV. http://dx.doi.org/10.1016/j.imavis.2015.06.001.

Kim, Yochan; Park, Jinkyun; Jung, Wondea.(2017). A quantitative measure of fitness for duty and work processes for human reliability analysis. Reliability Engineering & System Safety,v.167,p.595-601. Elsevier BV. http://dx.doi.org/10.1016/j.ress.2017.07.012.

Lean Institute Brasil (2017). Lean Thinking. Disponível em: http://www.lean.org.br. Acesso em: 02 de Dezembro, 2017.

Liker J. (2004). The Toyota Way: 14 management principles from the world’s greatest manufacturer. McGraw-Hill.

Liker, J. K., Meier, D. (2007). O Modelo Toyota: Manual Aplicação. Porto Alegre. Bookman.

Liu, Xiuquan et al(2018). Optimal inspection planning of corroded pipelines using BN and GA. Journal Of Petroleum Science And Engineering, v. 163, p.546-555, Elsevier BV. http://dx.doi.org/10.1016/j.petrol.2018.01.030.

Lopes, Milene Elizabeth Rigolin Ferreira; Forster, Carlos Henrique Quartucci. (2013). Application of human error theories for the process improvement of Requirements Engineering. Information Sciences, v. 250, p.142-161. Elsevier BV. http://dx.doi.org/10.1016/j.ins.2013.07.010.

Ludwig, P.J., et al .(2016) Aplicação da metodologia just in time para a redução de estoques em uma indústria do ramo moveleiro. Journal of Lean Systems, Florianópolis,SC, v. 1, n. 2, p. 25-39.

Martins, H. A. (2009). Estudo sobre os conceitos da autonomação e aplicação de PFMEA para auxílio na implementação de sistemas à prova de erro. Trabalho de graduação - Escola de Engenharia de São Carlos, Universidade de São Paulo, São Carlos.

Meudt T, Leipoldt C, Metternich J.(2016). Der neue Blick auf Verschwendung im Kontext von Industrie 4.0. Detaillierte Analyse von Verschwendungen in Informations logistic prozessen. ZWF Zeitschrift für wirtschaftlichen Fabrikbetrieb (11):754-758.

Middleton P. (2001). Lean software development: two case studies. Software Quality Journal v. 9:241–52.

Narayanamurthy G, Gurumurthy A. (2016). Leanness assessment: a literature review. International Journal of Operations & Production Management, 36 (10):1115-1160.

Negrão, L.L.L, et al. (2016) Estudo analítico sobre os conceitos Lean, Agile e Leagile aplicados às cadeias de suprimentos: Uma revisão de literatura. Journal of Lean Systems, Florianópolis,SC, v. 1, n. 4, pp. 87-111.

Ohno, T. (1988). Toyota Production System: Beyond Large-Scale Production. Portland, OR: Productivity Press.

Parente, Ronaldo C.; Geleilate, José-mauricio G.; Rong, Ke.(2018) The Sharing Economy Globalization Phenomenon: A Research Agenda. Journal Of International Management,v.24,n.1,p.52-64. http://dx.doi.org/10.1016/j.intman.2017.10.001.

Pereira, C. P. et al (2018). Implementation of energy value stream mapping (evsm) as an alternative tool for the management and reduction of energy in processes in the industrial sector: a literature review. Journal of Lean Systems, Florianópolis,SC, v. 3, n. 2, p. 104-130.

Profit Ability Engineers. Disponível em http://www.profitability.pt/. Acessado em 22 de março de 2018.

Saurin, Tarcisio Abreu; Ribeiro, José Luis Duarte; Vidor, Gabriel (2012). A framework for assessing poka-yoke devices. Journal Of Manufacturing Systems, v. 31, n. 3, p.358-366. Elsevier BV. http://dx.doi.org/10.1016/j.jmsy.2012.04.001.

Senna, P. et al. (2016) Avaliação da relação entre a importância e desempenho de práticas de lean manufacturing em um centro de distribuição. Journal of Lean Systems, Florianópolis,SC, v. 1, n. 2 , pp. 40-56.

Shingo S. (1988). Zero quality control: source inspection and the poka-yoke system. Productivity Press.

Sieckmann, Felix et al.(2018) Implementation of lean production systems in small and medium-sized pharmaceutical enterprises. Procedia Manufacturing, [s.l.], v. 21, p.814-821. Elsevier BV. http://dx.doi.org/10.1016/j.promfg.2018.02.188.

Smalley A.(2004). Creating level pull. Lean Enterprise Institute.

Torquato,L.M, et al.(2016) As células de produção no canteiro de obras sob a perspectiva dos sistemas complexos. Journal of Lean Systems, Florianópolis,SC, v. 1, n. 4, p. 112-124.

Vergara, Sylvia (2003). Projetos e Relatórios de Pesquisa em Administração. 4° Ed. São Paulo. Atlas.

Wan H, Chen F. (2008). A leanness measure of manufacturing systems for quantifying impacts of lean initiatives. International Journal of Production Research,46(23):6567–84.

Wiech, Michael; Böllhoff, Jörg; Metternich, Joachim.(2017). Development of an Optical Object Detection Solution for Defect Prevention in a Learning Factory. Procedia Manufacturing, [s.l.], v. 9, p.190-197. http://dx.doi.org/10.1016/j.promfg.2017.04.037.

Yamauchi, L. (2012). Aplicação de Poka-yokes como ações de PFMEA em linhas de montagem do setor automobilístico. Trabalho de Graduação - Faculdade de Engenharia Mecânica, Universidade Estadual de Campinas, Campinas.

Published

2019-04-10

Issue

Section

Artigos