Abstract

In the last decades, Lean Production has become a widely used concept among industries that aim to improve processes and eliminate waste. Associated with lean production, the efficiency in the use of materials and machines is gaining importance in the operational strategy of the companies. Considering the need of companies constantly investing resources and efforts to continuously improve their processes, applying techniques and new knowledge to make them more competitive, this article aims to highlight the efficiency gains (demonstrated by the OEE calculation) derived from the application of the method Heijunka in a service company. The case study was carried out in a service company, characterizing itself as a Drink Distribution Center, located in the Integrated Administrative Development Region (RIDE) in Pernambuco. From the calculated data, it was possible to perceive that it is possible to have better productivity derived from a better efficiency of the operations, as evidenced by Overall Equipment Effectiveness (OEE), overall efficiency index. This fact results, among other factors, from the leveling of production proposed by the Heijunka method.

Author Biographies

PEDRO VIEIRA SOUZA Santos, Universidade Federal do Vale do São Francisco (UNIVASF)

Engenheiro de Produção

José Américo Fernandes de Souza, Universidade Estadual de Santa Cruz (UESC)

Engenheiro de Produção na Universidade Estadual de Santa Cruz (UESC).

Eduína Carla da Silva, Universidade Federal de Campina Grande - UFCG

Engenheira de Produção (UFCG) e técnica em Segurança do Trabalho (IF Sertão -PE). 

Ciro Henrique de Araújo Fernandes, Universidade Federal do Vale do São Francisco (UNIVASF)

Graduado em Engenharia de Produção na Universidade Federal do Vale do São Francisco (UNIVASF).

References

Araujo, G. P., Cesar, F. I. G., Silva, A. L., & Ignácio, P. S. A. (2018). Aplicação do nivelamento heijunka em uma empresa de equipamentos hospitalares. Journal of Lean Systems, v. 03, n. 03, p. 02-23.

Bastos, A. L. A., Moura, R. S., Raiser, G., Draeger, L. C., Scheuer, F. B., & Conti, F. F. (2017). Dificuldades na implementação do lean manufacturing nas empresas do setor têxtil de Santa Catarina. Revista Produção Industrial & Serviços, 4(1): 01-12.

Bento, A. R., & Paulillo, G. (2010). Rastreabilidade e Inovação Tecnológica em Cadeias Produtivas na Indústria Automotiva. Anais do 65º Congresso Internacional da ABM. Rio de Janeiro

Bento, A. R.; Maximiliano, C.; Melo, J.; Morais, M. B. (2012). Utilização da Tecnologia OEE Como Ferramenta Para Monitorar Centros de Usinagem no Setor Automotivo. In: IX Congresso Virtual Brasileiro de Administração – CONVIBRA, São Paulo.

Bercaw, R. (2012). Taking improvement from assembly line to healthcare: the application of Lean within the healthcare industry. New York: CRC Press.

Chiarini, A. (2013). Lean Organization: from the Tools of the Toyota Production System to Lean Office. p. 166. Milan: Springer.

Coleman, B. J., & Vaghefi, M. R (1994). Heijunka: A key to the Toyota Production System. Production and Inventory Management Journal, 35(4): 31 – 35.

Earley, J. (2016). The Lean Book of Lean: a Concise Guide to Lean Management for Life and Business. p. 272. Chichester: Wiley.

Eaton, M. (2013). The Lean Practitioner's Handbook: Kogan Page.

Fleischer, J., & Weismann, U., & Niggeschmidt, S. (2006). Calculation and optimization model for costs and effects of availability relevant service elements, in Proceedings of LCE.

Garza-Reyes, J. A. (2015). From measuring overall equipment effectiveness (OEE) to overall resource effectiveness (ORE). Journal of Quality in Maintenance Engineering, 21(4): 506-527.

Ghobakloo, M., & Azar, A. (2018). Business excellence via advanced manufacturing technology and lean-agile. Journal of Manufacturing Technology Management, 2-24.

Gil, A. C. (2007). Como elaborar projetos de pesquisa. 4. ed. São Paulo: Atlas.

Korytkowski, P., Grimaud, F., & Dolgui, A. (2014). Exponential smoothing for multi-product lot-sizing with heijunka and varying demand. Management and Production Engineering Review, 5(2): 20–26.

Licker, J. K. (2005). Toyota fieldbook. New York: McGraw-Hill.

Mazur, I. et al. (2018). Real Time Monitoring of The OEE Index: Case Study in a Decision Support Process. South American Development Society Journal. Ed especial, 1.

Nakajima, S. (1989). TPM Development Program: Implementing Total Productive Maintenance. Productivity Press. Portland: OR.

Ohno, T. (1997) O Sistema Toyota de Produção: Além da produção em larga escala. Porto Alegre: Bookman

Ohno, T. (1997). O Sistema Toyota de Produção: além da produção em larga escala. Porto Alegre: Bookman.

Oliveira, M. R., & Hemosilla, J. L. G., & Silva, E. C. C. (2012). Implantação do Índice de Eficiência Global dos Equipamentos em uma Célula de Manufatura de uma Empresa de Grande Porte do Setor Automotivo – Segmento de Embreagens. Anais do XV Simpósio de Administração da Produção, Logística e Operações Internacionais - SIMPOI. São Paulo.

Oliveira, T., & Helleno, A. (2012). Sistema de Apoio à Gestão da Produção: Indicadores de Eficiência Operacional – Estudo de Caso. Ciência e Tecnologia, 17(33)

Pacheco, D. A. J. (2013). Teoria das Restrições, Lean Manufacturing e Seis Sigma: limites e possibilidades de integração. Production, 20(10).

Piva, A. M. S., Prando, G., & Morilla, J. C. (2016). Estudo comparativo entre as metodologias Lean Manufacturing e Lean Six Sigma. Unisanta Science and Technology, 5(2): 96-103.

Proença, E.; Tubino, D. (2010). Monitoramento Automático e em Tempo Real da Eficácia Global dos Equipamentos (OEE) como Prática de Apoio à Manufatura Enxuta: Um Estudo de Caso. Anais do Encontro Nacional de Engenharia de Produção (ENEGEP), 30.

Ribeiro, G., & Paes, R., & Kliemann, F. (2010). Aplicação da Metodologia OEE para Análise da Produtividade do Processo de Descobertura de Carvão Mineral em uma Mina a Céu Aberto. Anais do XXX Encontro Nacional de Engenharia de Produção - ENEGEP. São Carlos-SP, Brasil.

Rodrigues, M. V. (2016). Entendendo, aprendendo e desenvolvendo sistema de produção Lean Manufacturing. Rio de Janeiro: Elsevier, 2. Ed.

Santos, P. V. S. (2018). Aplicação do indicador overall equipment effectiveness (oee): um estudo de caso numa retífica e oficina mecânica. Brazilian Journal of Production Engineering. 4(3): 1-18.

Santos, P. V. S., & Araújo, M. A. (2018). Aplicação de ferramentas lean no setor de logística: um estudo de caso. Revista Gestão em Análise, 7(2): 168-183.

Santos, P. V. S., & Lima, N. V. M. (2018). Fatores de impacto para sobrevivência de micro e pequenas empresas (MPEs). Revista Livre de Sustentabilidade e Empreendedorismo, 3: 54-77.

Santos, P. V. S., & Pinheiro, F. A. (2017). O plano de negócios como ferramenta estratégica para o empreendedor: um estudo de caso. Revista Latino-Americana de Inovação e Engenharia de Produção, 5(8): 150-165.

Santos, P. V. S., & Rocha, M. F. de B. (2017). Inovação no processo de desenvolvimento de estratégias competitivas em pequenas e médias empresas. Revista Mundi Engenharia, Tecnologia e Gestão, 2(2): 48 -1-48 – 20.

Santos, P. V. S., & Santos, L. D. P. G. Dos; (2018). Gestão de indicadores: um estudo de caso no setor de serviços. Brazilian Journal of Production Engineering, 4(4): 115-133.

Silva, A., & Pasqualini, F. (2016). Nivelamento da Produção de Componentes da colheitadeira utilizando Quadros Heijunka: um estudo na empresa AGCO DO BRASIL. Trabalho de conclusão de curso em Administração da Universidade Regional do Noroeste do Estado do Rio Grande do Sul. 62p. Santa Rosa, Rio Grande do Sul, Brasil.

Silva, J.P.R. (2014). OEE a forma de medir a eficácia dos equipamentos. Disponível em: <http://pt.scribd.com/doc/15122575/OEE-A-FORMA-DE-MEDIR-A-EFICACIA-DOSEQUIPAMENTOS>. Acesso em: 05 de jan, 2019.

Silveira, C. B. (2014). Muda, Mura e Muri: O modelo 3M do sistema Toyota de Produção. Disponível em: <https://www.citisystems.com.br/muda-mura-muri/>. Acesso em: 5 jan. 2019.

Womack, J. P., Jones, D. T., & Roos, D. (2004). A máquina que mudou o mundo. Rio de Janeiro: Campus, 8. ed.

Yin, R. K. (2001). Estudo de caso – planejamento e métodos. (2Ed.). Porto Alegre: Bookman.

Published

2020-10-13

Issue

Section

Artigos