A3 Case - Continuous improvement in the manual assembly line of hospital equipments

Authors

  • Ingrid Astigarreta Unilasalle- RJ
  • Marcelo Arese Unilasalle- RJ

Keywords:

Lean System, Waste, Hospital Equipment

Abstract

A3 Case - Continuous improvement in the manual assembly line of hospital equipments

Downloads

Published

2018-07-12

Issue

Section

Artigos